Natural Gas · Available where covered

Natural Gas Curve

Henry Hub M1-M2, M1-M6, and curve tightness

Open in Enerlytics →
Builder card: natural_gas_term_structure. Search the standard palette to add it. Browse the component catalog.

How To Use It

Search the builder palette for Natural Gas Curve, add or drag it onto the canvas, resize it as needed and save the dashboard.

What The Measures Mean

M1−M2 = Henry Hub M1 settlement minus M2 settlement; M1−M6 = M1 minus M6. Units are $/MMBtu. Read contract months because the gas curve is seasonal.

A Worked Example

Example: Henry Hub M1−M2 widens after a storage draw. Counterexample: a calendar roll can change the compared months without a same-contract tightening.

Limits And Common Misreads

Check the actual contract month, settlement date, roll boundary and spread unit. A continuous quote and a dated calendar settlement are not interchangeable.

Source And Freshness

Look for the source label and as-of or publication time on the live card. Different feeds refresh on different schedules. Read the freshness guide before comparing them.

  • Enerlytics application state and linked evidence

Last reviewed 2026-11-10. Examples are illustrative or historical as labeled; open the dashboard for current observations.

Was this guide helpful?

Natural Gas Curve • Enerlytics